Author: AussieBoy » July 8, 2008, 4:41 pm
DD complete plans by April 07, old home is in a DPC Demolition Precinct Control, so its off to the council for approval, if not in control area right of way to build, no need for council approval, We have private certifiers to approval building works.
Council approves plans by June07, old home was built after the war so no need to keep, any pre war 2 homes have to be kept, but only a part of them, another story of home next door which was a pre war home.
Demo is approved, client makes more changes to new home plans drawn up now it December 07.
Feb 08 the plans are put back to the engineer for steel work new counterlever work, First final from engineer arrives march, more changes as the master builder inspects the design, back to the engineer, client makes more changes, and back to the MB, now it may 08 the Master Builder LOOKS AT THE PLANS AGAIN, still more design errors, back to the engineer for changes. final final plans July 08. sign up for $638,000
Cut the block to the pad level, owner says going to deep, MB says piss off, so its stop work tell owner look here on plan , height 9.600 mts , maxium height allowed 8.500, must dig 1.100 mt at low point, HUMMMMMMMMMMMM says owner go back to DD and find problem, to deep.
Dork designs yuppy has no idea and house is too high, some bad calulations, wait 1 week till now for new design, Unless the ceiling level are less than 2.100mt 7 foot, which won't pass the BCA its dig. Building code Australia.
Now it rains, cut pad is now a pool, and its back to the masters plan of dig my son dig deeper, or loose the top floor, Now the owner is up for $8000 extra to remove 50 cmt of soil, and the DD is not to be seen on site.
So while its wet, time to re-engineer the footings, to suit the new depth, back to the engineers office, there will have to be a step in the design to get the building under the height, But wait the deeper we go the steeper the driveway, now the driveway is less than 1-4, to steep to meet the rules, so its raise the garage area so the car wont botton out on the driveway, next week plans will be back mid july